Broome Primary School
Modular Buildings
Project overview
Client
Broome Primary School
Location
Broome
Service
Installation of seven modular buildings and compliant in sixteen days
SCOPE OF WORKS
MACS were called in to restore the Broome Primary School’s classroom before the students came back from holidays in 2020, after an escapee prisoner set alight to the school, destroying Broome local primary school. In a quick response MACS restored/replaced the classrooms destroyed by fire in time for the students to return for 2020. Installing modular buildings on an active demolition site that included significant friable asbestos removal. The full extent of the connectivity of existing services was unknown until the second week, so several different options needed to be explored and ready to execute.